Changing T-piece ahead of the cyclone dust catcher “Wirbler HO1”

Planungsgesellschaft m.b.H. Dinslaken > Projects > Changing T-piece ahead of the cyclone dust catcher “Wirbler HO1”
Customerthyssenkrupp Steel Europe AG
ProjectChanging T-piece ahead of the cyclone dust catcher “Wirbler HO1”
LocationDuisburg-Schwelgern
  • Feasibility study for the exchange of a T-piece ahead of the cyclone dust catcher “Wirbler HO1”
  • Creating a solid model of the T-piece for a FEM calculation and collision check
  • Measurement of existing wall thickness at several control points and incorporation into the model
  • Forecast of wall thickness development
  • FEM calculation of tension (new conditions, current wall thickness and its forecast)
  • Development of an assembly concept with schedule, crane study and cost estimation
  • Temporary mounting support of the pipeline K7-K9 with a preliminary static inspection
  • Redesigning the diagonal bracing in the scaffold with a preliminary static inspection
  • Creation of a 3D animation to determine the assembly process